Caltrans Contract Cost Data [2016].
Orange/Anaheim/Corona, California, United States
This document was a notice to bidders regarding the integration of an ITS network used to connect changeable message signs (CMS) and closed circuit television cameras (CCTV) with a Traffic Operations Center (TOC) to manage traveler information and traffic surveillance on the Route 91 Express Lanes between Orange, Anaheim, and Corona, California. Bid documents included specifications for integration of the system during a larger construction project on the corridor.
System testing included testing to prove functionality and operation for local, subsystem, and final system integration.
The following bids were posted on the California DOT Contract Cost Data Website (Contract No. 12-0N0404).
Bid Tab Item Description |
Unit
|
District
|
Qty
|
Unit Price [2016$]
|
Bid Open Date
|
Bidder ID
|
---|---|---|---|---|---|---|
TOC-CMS System Integration Testing and Documentation |
Lump Sum
|
12
|
1
|
$21,000
|
04/28/2016
|
Bidder 1
|
TOC-CMS System Integration Testing and Documentation |
Lump Sum
|
12
|
1
|
$18,000
|
04/28/2016
|
Bidder 2
|
TOC-CMS System Integration Testing and Documentation |
Lump Sum
|
12
|
1
|
$20,000
|
04/28/2016
|
Bidder 3
|
ADJUSTED COST using the Caltrans Construction Cost Index.
- Average Price/Unit: $23,036 [2018$]
- Max Price/Unit: $21,084 [2018$]
- Min Price/Unit: $24,598 [2018$]
Proposed costs for system integration activities were bid under a separate line item. Project duration was estimated at 140 working days.
State of California DOT Notice To Bidders and Special Provisions for Construction on State Highway in Orange and Riverside Counties (Contract No. 12-0N0404)
Average price for TOC-CMS system integration testing and documentation: $19,667 [2016$]