| Unit Cost Element | Unit Cost Component | Description | Location | Cost Type | Data Date | Reported Units | Units | Year (Dollars) | Capital Cost Per Unit | O& M Cost Per Unit | Lifetime (Years) | View Details |
| Automatic Passenger Counting System | Automated passenger counter (APC) Interface to AVL | Integration of an APC system with a GPS-based AVL system. | United States | Estimated | 2009 | 1 | System | 2009 | $15,000.00 | $1,500.00 | | View Details |
| Automatic Passenger Counting System | Automated passenger counter (APC) Interface to AVL | Integration of an APC system with a GPS-based AVL system. | United States | Estimated | 2009 | 1 | System | 2009 | $25,000.00 | $2,500.00 |  | View Details |
| Automatic Passenger Counting System | Automated passenger counter (APC) on-board unit | Automatically counts passengers as they board and alight transit vehicles using infrared beam. An electronic record is created at each bus stop that typically incudes stop location, stop date/time, time of doors opening/closing, and total number of passengers boarding and alighting. | United States | Estimated | 2009 | | Per Vehicle | 2009 | $2,500.00 | $100.00 | | View Details |
| Automatic Passenger Counting System | Automated passenger counter (APC) on-board unit | Automatically counts passengers as they board and alight transit vehicles using infrared beam. An electronic record is created at each bus stop that typically incudes stop location, stop date/time, time of doors opening/closing, and total number of passengers boarding and alighting. | United States | Estimated | 2009 |  | Per Vehicle | 2009 | $6,000.00 | $250.00 |  | View Details |
| Automatic Passenger Counting System | Automated Passenger Counter (APC) system | Automatic Passenger Counter System unit | Canada,USA | Estimated | 2003 | | Each (EA) | 2002 | $3,000.00 | | | View Details |
| Automatic Passenger Counting System | Automated passenger counter (APC) system software | Software that supports APC system transit management function. | United States | Estimated | 2009 | 1 | System | 2009 | $50,000.00 | $5,000.00 |  | View Details |
| Automatic Passenger Counting System | Automated passenger counter (APC) system software | Software that supports APC system transit management function. | United States | Estimated | 2009 | 1 | System | 2009 | $80,000.00 | $8,000.00 | | View Details |
| Automatic Passenger Counting System | Automatic Passenger Counter (APC) | Transit. | Florida, USA | Estimated | 2003 |  | Each (EA) | 2003 | $15,000.00 |  |  | View Details |
| Automatic Passenger Counting System | Automatic Passenger Counter (APC) | Transit. from the Center for Urban Transportation’s (CUTR) JTA case study on APCs. | Florida, USA | Actual | 2003 | | Each (EA) | 2003 | $10,500.00 | | | View Details |
| Automatic Passenger Counting System | Automatic Passenger Counter (APC) system | Automatic Passender Counter System unit | Canada,USA | Estimated | 2003 |  | Each (EA) | 2001 | $1,000.00 |  |  | View Details |
| Automatic Passenger Counting System | Automatic Passenger Counter (APC) system | Automatic Passenger Counter system | Canada,USA | Estimated | 2003 | | Each (EA) | 2001 | $6,000.00 | | | View Details |
| Automatic Passenger Counting System | Automatic Passenger Counter (APC) system | Automatic Passenger Counter system unit | Canada,USA | Estimated | 2003 |  | Each (EA) | 2002 | $10,000.00 |  |  | View Details |
| Automatic Passenger Counting System | Automatic Passenger Counters | Based on packages of two sensors and one analyzer unit per vehicle, not including installation. COTS. Manufacturer - IRIS. | Tampa, Florida, USA | Estimated | 2006 | 233 | Each (EA) | 2006 | $2,100.00 | | 10 | View Details |
| Automatic Passenger Counting System | Automatic Passenger Counters for Transit Vehicles | Capital costs include installation on KCATA Metro buses. The system distinguishes between boardings and de-boardings with infrared technology, and records corresponding GPS data to support follow-up spatial analysis of route activity. Units were manufactured by Urban Transportation Associates (UTA) out of Cincinnati, Ohio. | Kansas City, Missouri, USA | Actual | 2003 | 16 | Each (EA) | 2003 | $12,000.00 | $100.00 | 8 | View Details |
| Automatic Passenger Counting System | Passenger Counting System | Passenger Counting System | Ann Arbor, Michigan, USA | Actual | 1998 | 75 | Per Vehicle | 1998 | $287.00 | | | View Details |