Unit Cost Entry
Unit Cost Element - Conduit Design and Installation - Corridor
Unit Cost Component - Conduit
North Carolina, United States
Description
1.25 inch conduit. Includes directional drilling at $13 per linear foot.
Cost Type
Bid TabulationData Date
2006Reported Units
Units
LFYear (Dollars)
2006Capital Cost per Unit ($)
$18.25O & M Cost per Unit ($)
Lifetime
yearsNotes
Cost figures derived from 2006 NC DOT bid averages.Application Areas
Intelligent Transportation Systems > Freeway Management > Information Dissemination > Dynamic Message Signs
Intelligent Transportation Systems > Arterial Management > Information Dissemination > Dynamic Message Signs
Intelligent Transportation Systems > Traffic Incident Management > Information Dissemination > Dynamic Message Signs
Related Unit Cost Subsystems
Keywords
DMS, CMS, VMS, Changeable Message Signs, Variable Message Signs
ID: 2011-01898

