Cost

Virginia DOT set aside $300,000 annually to maintain and upgrade ADMS Virginia; maintaining the ADMS was estimated to require 1 to 1.5 full time equivalent positions.


August 2005
Statewide,Virginia,United States


Summary Information

In 2002, the Federal Highway Administration awarded a field operational test to the Virginia DOT to use archived data to effect transportation operations and management decisions. The scope of the project was expanded to include applications for transportation planners as well as operators.

Initially, ADMS Virginia was implemented at the Hampton Roads Smart Traffic Center and then operations were expanded to include support for the Northern Virginia Smart Traffic Center. The Virginia DOT (VDOT) led the deployment with help from the University of Virginia (UVA) and George Mason University (GMU). ADMS software systems were developed by Open Roads Consulting, Inc., with hardware and equipment provided by the Smart Travel Laboratory (a joint facility of VDOT and UVA).

Virginia DOT set aside $300,000 annually to maintain and upgrade ADMS Virginia. The Smart Travel Laboratory is staffed with a full-time database administrator, a part-time database administrator, a part-time document writer, and a software developer. Maintaining the system was estimated to require 1 to 1.5 full-time equivalent positions—approximately one-third of the total staff's time.

Key features of ADMS Virginia included:

Data Processing and Management Functions
  • Procedures for quality control and management of relational database data input processes and formats.
  • Managerial statistics, charts, and reports
User Functions and Applications
  • Standard data queries from traffic, incident, weather, and transportation management system databases
  • Mobility measures of effectiveness from archived data to retrieve information on traffic speed, flow rate, volume/capacity ratio, speed standard deviation, and vehicle miles traveled
  • Operations and maintenance information to evaluate current road conditions, data quality at sensor stations, and compare current incidents with past incidents
  • Evacuation and special events planning services
  • HOV monitoring and evaluation data
  • Transportation planning tools to support air quality analysis (long-range planning)
  • DynaMIT simulation modeling support


System Cost Comments

No comments posted to date

Comment on this System Cost

To comment on this summary, fill in the information below and click on submit. An asterisk (*) indicates a required field. Your name and email address, if provided, will not be posted, but are to contact you, if needed to clarify your comments.



Source

National Evaluation of the TMC Applications of Archived Data Operational Test - ADMS Virginia

Published By: U.S. DOT

Prepared by SAIC for the U.S. DOT

Source Date: August 2005

EDL Number: 14250

Other Reference Number: FHWA-JPO-06-014

URL: http://ntl.bts.gov/lib//jpodocs/repts_te//14250_files/14250.pdf

System Cost

ADMS upgrade and initial annual maintenance costs: $300,000.

Rating

Average User Rating

0 ( ratings)

Rate this System Cost

(click stars to rate)

Cost ID: 2008-00174