Cost Subsystem
Description

Load Center Cabinet (Type 4) w/ Transformer and Meter

Capital Cost Per Unit
$10,200.00
Adjusted Capital Cost Per Unit
$8,979.06
Reported Units
4
Unit Cost Type
Unit
Each (EA)
CPI ID
2
CPI Name

WPU1178

Year
2009
Notes
Arizona Bid Tab 2008106 - Bidder 2. Electrical cabinet for CCTV installation.