Unit Cost Entry

Unit Cost Element - Roadside Signal Preemption/Priority

Unit Cost Component - Roadside Signal Preemption / Priority


Florida, USA


Description

Includes a global positioning system (GPS) and does not include traffic signal costs.

Cost Type

Actual

Data Date

2003

Reported Units



Units

Intersection

Year (Dollars)

2003

Capital Cost per Unit ($)

$5,700.00

O & M Cost per Unit ($)



Lifetime

7 years


Notes

Broward County

Source

Intelligent Transportation System Deployment Analysis System Customization: Technical Memorandum No.4 - Florida-Specific Intelligent Transportation System Deployment Costs Version 2

Author: Hadi, Mohammed and Prasoon Sinha

Published By: Florida DOT, Traffic Engineering and Operations Office, ITS Section

URL: http://www.floridaits.com
/PDFs/TWO17_IDAS/040805-T
M4-V2.pdf
Related System Cost ID: 2008-00162

Unit Cost Details

Capital Cost per Unit: $5,700.00

O&M Cost per Unit:

Year (Dollars): 2003

Lifetime: 7 years


Related Unit Cost Subsystems

Roadside Control (RS-C)

Keywords

preempt, emergency preemption, traffic signals, EVP

ID: 2010-00345