Nationwide, United States
A Transportation Research Board (TRB) study examined the costs, impacts, and effectiveness of several bus rapid transit (BRT) systems in the United States and abroad. Unit costs were identified for several BRT components. Guidance was provided to help agencies estimate capital and operating costs relative to their location and scale of application.
Representative development and operating costs from Exhibit S-1 of the source report are listed below (Engineering and design costs included).
RUNNING WAYS
Component |
Capital Cost (2004 dollars)
|
|
---|---|---|
Off-street busway | At-grade |
$5 million per route-mile
|
Grade-separated |
$13 million per route-mile
|
|
- Elevated |
$50 million per route-mile
|
|
- Tunnel |
$200 million per route-mile
|
|
On-street busway | Median arterial busway |
$4 million per route-mile
|
Bus lane - new construction |
$25 million per route-mile
|
|
Bus lane - striping lane |
$100,000 per route-mile
|
Development costs include land acquisition, construction, and engineering. These costs vary by running way location, type, design features, and the type of terrain traversed. Busway operating costs have been estimated at $10,000 per year per lane-mile.
TRANSIT PREFERENTIAL TREATMENTS
Component |
Capital Cost (2004 dollars)
|
|
---|---|---|
Queue bypass | Parking removal |
Negligible per approach
|
Use of right turn lane |
Negligible per approach
|
|
Added lane |
$300,000 per approach
|
|
Curb extension |
$60,000 per extension
|
|
Transit signal priority (TSP) |
$30,000 per intersection
|
|
Special transit phase |
$10,000 per intersection
|
The costs for bus queue jumps and bypass lanes depend on the availability of existing roadway lanes and/or shoulders. The cost of a bus queue jump signal is estimated to range from $5,000 to $15,000, based on the type of detection deployed (loop vs. video, respectively).
Costs of curb extensions vary depending on the length and width of the treatment, site constraints, and the specific design of the curb extension. In San Francisco, for example, curb extensions cost $40,000 to $80,000 each.
The cost to deploy TSP on a BRT corridor depends on the configuration of the existing signal control system, intersection equipment/software costs, vehicle costs, and whether central control will be localized or integrated into a regional traffic management center (TMC). At intersections where existing controller equipment and software can be reused, upgrade costs are approximately $5,000. If the equipment needs to be replaced upgrade costs increase to approximately $20,000 to $30,000 per intersection.
BRT STATIONS
Component |
Capital Cost (2004 dollars)
|
|
---|---|---|
Typical | Basic |
$21,000 per station (1 direction)
|
Enhanced |
$30,000 per station (1 direction)
|
|
Major | At-grade |
$150,000 per station
|
Grade-separated |
$2.5 million per station
|
|
Intermodal center |
$12.5 million per station
|
|
Passing lane |
$2.7 million per lane-mile
|
Major cost drivers for BRT stations include the provision of station buildings and the cost of bus passing lanes. In some areas the cost of land acquisition can be reduced if railroad or freeway right-of-ways are available. Researchers noted, however, that such right-of-ways may generate little walk-on traffic, have limit opportunities for land development and require complex negotiations.
FARE COLLECTION
Component |
Capital Cost (2004 dollars)
|
|
---|---|---|
On-board | Magnetic card media |
$15,000 per vehicle
|
Smart media |
$20,000 per vehicle
|
|
Off-board | Magnetic card media |
$60,000 per machine
|
Smart media |
$65,000 per machine
|
Fare collection can be conducted on vehicles and/or at stations depending upon agency policy, passenger movement, and station design. In the United States, most BRT systems use pay-on-board systems. The table below excerpted from Exhibit 4-127 of the report provides capital and maintenance costs data for several types of fare collection equipment and media. The costs vary depending on system requirements/specifications, quantity purchased, and the manufacturer.
Capital Cost Elements (Bus-Related Fixed Costs per Unit) |
Low
|
High
|
---|---|---|
Mechanical fare box |
$2,000
|
$3,000
|
Electronic registering fare box |
$4,000
|
$5,000
|
Electronic registering fare box (with smart card reader) |
$5,000
|
$8,000
|
Validating fare box (with magnetic card processing unit) |
$10,000
|
$12,000
|
Validating fare box (with smart card reader) |
$12,000
|
$14,000
|
Validating fare box (with magnetic & smart card reader) |
$13,000
|
$17,500
|
Stand-alone smart card processing unit |
$1,000
|
$7,000
|
Magnetic fare card processing unit (upgrade) |
$4,000
|
$6,000
|
On-board probe equipment (may not be required integrated with regional system) |
$500
|
$1,500
|
Garage probe equipment (may not be required if integrated with regional system) |
$2,500
|
$3,500
|
Application software (smart card units) |
$0
|
$100,000
|
Garage hardware/software |
$10,000
|
$20,000
|
Central hardware/software |
$25,000
|
$75,000
|
|
||
Payment Media Costs |
Low
|
High
|
Magnetic or capacitive cards |
$0.01
|
$0.30
|
Contactless cards (plastic) |
$2.00
|
$5.00
|
Contactless cards (paper) |
$0.30
|
$1.00
|
Contact cards |
$1.50
|
$4.00
|
Operation and Maintenance Costs |
Low
|
High
|
Spare parts (% of equipment cost) |
10%
|
15%
|
Support services include training, documentation, revenue testing, and warranties (% of equipment cost) |
10%
|
15%
|
Installation (% of equipment cost) |
3%
|
10%
|
Nonrecurring engineering & software costs (% of equipment cost) |
0%
|
30%
|
Contingency (% of equipment/operating cost) |
10%
|
15%
|
Equipment maintenance costs (% of equipment cost) |
5%
|
7%
|
Software licenses/system support (% of systems/software cost) |
15%
|
20%
|
Revenue handling costs (% of annual cash revenue) |
5%
|
10%
|
Clearinghouse (e.g., card distribution, revenue allocation) (% of annual automatic fare collection revenue). Note: cost may depend on the nature of the regional fare program, if any. |
3%
|
6%
|
PASSENGER INFORMATION
Component |
Capital Cost (2004 dollars)
|
---|---|
At-station information |
$6,000 per sign
|
On-board information |
$4,000 per vehicle
|
Passenger information systems use AVL to track bus arrival times. On-board systems communicate next stop arrival information to customers using on-board monitors or audible announcements. At-station electronic information displays provide customers with bus status or arrival time information.
VEHICLES
Transit Vehicle |
Capital Cost (2004 dollars)
|
---|---|
Conventional standard |
$325,000 per vehicle
|
Stylized standard |
$350,000 per vehicle
|
Conventional articulated |
$570,000 per vehicle
|
Stylized articulated |
$780,000 per vehicle
|
Specialized BRT |
$1.3 million per vehicle
|
The cost of a conventional 40- to 45-foot partial low-floor bus ranges from $300,000 to $350,000. Hybrids will cost about $150,000 more per vehicle than a diesel powered bus.
IN-VEHICLE ITS
Component |
Capital Cost (2004 dollars)
|
|
---|---|---|
On-board vehicle guidance | Optical/magnetic sensors |
$20,000 per mile
|
Hardware integration |
$50,000 per vehicle
|
|
On-board precision docking | Optical/magnetic sensors |
$4,000 per station
|
Hardware integration |
$50,000 per vehicle
|
|
On-board performance monitoring |
$2,000 per vehicle
|
|
Automatic Vehicle Location (AVL) |
$8,000 per vehicle
|
|
On-board security |
$10,000 per vehicle
|
Driver assist and automation systems can be applied individually or collectively on a new BRT vehicle. Integration of on-board equipment can substantially increase the cost of a new vehicle.
AVL systems track the location of BRT vehicles and support other ITS, such as, TSP, automated passenger counter systems, dynamic routing, and demand management applications.
Costs for on-board safety and security components vary widely depending on the procurement strategy used and quantity of units purchased. Smaller agencies may experience increased costs due to limited economies of scale.
TCRP Report 118: Bus Rapid Transit Practitioner's Guide
Hardware integration for on-board precision docking systems: $50,000 per vehicle. Hardware integration for automated vehicle guidance: $50,000 per vehicle. AVL systems: $8,000 per vehicle. On-board smart card fare collection systems: $20,000 per vehicle. On-board security systems: $10,000 per vehicle. On-board passenger information systems: $4,000 per vehicle. On-board performance monitoring systems: $2,000 per vehicle.