Develop early deployment and rapid prototyping strategies to improve the project development process.

Virginia DOT’s experience integrating data from public works and public safety agencies.


January 2005
Virginia,United States


Background (Show)

Lesson Learned

Develop early deployment and rapid prototyping strategies to improve the project development process.

Early Deployment

Develop early deployment strategies. Such strategies can enhance the project development process by improving communications and providing opportunities for testing and evaluation. Because of the use of a Message Oriented Middleware (MoM) service, the project decomposed into two separate development efforts. First was the sending of VSP CAD data to the MoM service in the standard CAP message format. The second was receiving the CAP messages and integrating them into the Richmond's OpenTMS system. In terms of effort, it was estimated that the integration of CAP messages into the STC system was on an order of magnitude greater than the effort to integrate the CAD data into the MoM. VSP's and NGC's participation in the project was mostly connected to the integration of CAD messages to the MoM. There was a need to be able to validate that interface without having to wait for the completion of the MoM to STC system integration. It was decided that a simplified CAP message viewer would be developed to view the CAP messages sent by the VSP CAD system and forwarded by the MoM service. This AlertViewer would benefit the project in a number of ways:
  1. The CAD-to-MoM-to-Viewer integration was developed and validated early on in the project
  2. VDOT would get an early estimate of the amount of CAP messages that they would be receiving from the CAD interface
  3. The bandwidth required for the message volume could be evaluated early in the project
  4. The viewer would provide a “template” for the future CAP integration with the STC system
  5. VDOT operators would be able to build confidence in the integration by matching data from the interface with information they currently receive via phone calls and the police scanner
  6. VDOT would get an early return on their investment in the project
    • Early successes in the interface would maintain high morale during the project
    • The AlertViewer would allow other VDOT offices to see the type of information they would eventually be able to receive
    • The AlertViewer could eventually be made available to other VDOT offices to view the CAD data without having to invest significant monies into a complicated system integration
    • VSP's and NGC's involvement in the project would be greatly reduced beyond the initial CAD-to-MoM integration

The development and use of the AlertViewer was useful in fine-tuning the interface between the CAD system and the MoM server. The CAD event types that were useful were identified while other event types were tagged as not needed. Some small system integration problems were identified early in the effort and were fixed long before the MoM-STC system integration was completed. Data from this tool also became a discussion item during project progress meetings.

Through the use of the AlertViewer, it became apparent that VSP dispatchers were not using the ROADI segment consistently. Some operators made good use of the new segment while others simply ignored it. Because of this, VSP initiated a training program for all dispatchers on how to use the ROADI segment and how to enter information that would be useful to VDOT. This training greatly helped the exchange of information between the two agencies. Additionally, these types of activities were conducted in parallel with the continued STC integration effort.

Rapid Prototyping

Develop and implement rapid prototyping strategies. The early stages of a project can be difficult. The developers are trying to nail down requirements so that they can deliver a solid product and a firm estimate of cost. The clients are trying to make sure that the system that they are designing and ultimately paying for will satisfy their needs and not cause them undue hardship. Frequently these two groups are speaking very different languages. During the early stages of this project, a very valuable technique was employed to help bridge that communication gap. Prototype screens of the proposed system modifications were generated and paper copies were printed for use in briefing and requirements definitions meetings. Mock up screens with functional buttons could have been generated, but the paper versions of the screens were used for two very important reasons.

First, they could be marked up, written on and occasionally cut up. This allowed the client to clearly indicate how they felt about the capabilities of the modified system and the manner in which those capabilities would be presented. They were not shy about marking up the images and asking us about certain capabilities. Though this process of rapid prototyping, both the developers and operators were able to arrive at an accurate and consistent understanding of the end product that was to be developed. In short, there was a better ability to bridge any communication problems and speak the same language. The client was able to “see” what the system would provide, and the developers were able to understand client expectations.

Second, hardcopy screens were used to emphasize to the operators that the screens were temporary, changeable, and disposable. Often a client sees a mock-up or a prototype of some system screens and assumes that the system is complete or that too much work has been expended to change the screens – even though, the mock-up screens are usually very quickly created and have little or no underpinnings. In this situation, the use of screens printed on paper proved an effective methodology.


Lesson Comments

No comments posted to date

Comment on this Lesson

To comment on this lesson, fill in the information below and click on submit. An asterisk (*) indicates a required field. Your name and email address, if provided, will not be posted, but are to contact you, if needed to clarify your comments.



Source

Challenges Faced and Tactics Used to Integrate Real-Time State Police CAD Data with the VDOT Richmond District Smart Traffic Center: Lessons Learned Document

Author: Robison, David, Matt Sargent, and Steve Beckwith

Correspondence with Robb Alexander , Virginia DOT, on April 6, 2006

Published By: Virginia DOT

Prepared by Open Roads Consulting, Inc. for the Virginia DOT

Source Date: January 2005

EDL Number: 14115

URL: http://ntl.bts.gov/lib/jpodocs/repts_te/14115.htm

Other Lessons From this Source

Lesson Contacts

Lesson Contact(s):

David Robison
Open Roads Consulting
757-546-3401
drrobison
@openroadsconsulting.com


Agency Contact(s):

Robert Alexander, P.E.
Virginia Department of Transportation
804-796-4533
robert.alexander
@vdot.virginia.gov

Lesson Analyst:

Jane Lappin
Volpe National Transportation Systems Center
617-494-3692
jane.lappin@volpe.dot.gov


Rating

Average User Rating

0 ( ratings)

Rate this Lesson

(click stars to rate)


Lesson ID: 2005-00058