Unit Cost Entry

Unit Cost Element - Design & Development

Unit Cost Component - VDOT Administrative/Engineering Costs


Richmond, Virginia, USA


Description

VDOT Administrative/Engineering Costs

Cost Type

Actual

Data Date

2003

Reported Units



Units

Lump Sum (LS)

Year (Dollars)

2003

Capital Cost per Unit ($)

$37,000.00

O & M Cost per Unit ($)



Lifetime

years


Notes

Unit cost data came from conversation with Rob Alexander of VDOT on April 6, 2006 - Source did not include Unit costs.

Source

Challenges Faced and Tactics Used to Integrate Real-Time State Police CAD Data with the VDOT Richmond District Smart Traffic Center: Lessons Learned Document

Author: Robison, David, Matt Sargent, and Steve Beckwith

Correspondence with Robb Alexander , Virginia DOT, on April 6, 2006

Published By: Virginia DOT

Prepared by Open Roads Consulting, Inc. for the Virginia DOT

EDL Number: 14115

URL: http://ntl.bts.gov/lib/jp
odocs/repts_te/14115.htm

Related System Cost ID: 2006-00095


Unit Cost Details

Capital Cost per Unit: $37,000.00

O&M Cost per Unit:

Year (Dollars): 2003

Lifetime: years