Cost

The National Transportation Operators Coalition estimates that upgrading and retiming the US's traffic signals over 10 years would cost $1.125 billion annually

Findings from the 2007 National Traffic Signal Report Card


December 31, 2007
Nationwide; United States; Nationwide; Canada


Summary Information

The 2007 Transit Signal Self-Assessment, a voluntary self-assessment survey, was taken by 417 agencies in the US and Canada in 2006, in order to determine their "report card" grade for traffic signal operations. This report card uses a questionnaire to determine grades for management, individual signal operations, coordinated signal operations, signal timing practices, traffic monitoring and data collection, and maintenance. The self-assessment is one way for agencies to evaluate their existing practices and create a plan to improve their traffic signal operations and management. The 2007 National Traffic Signal Operation Report Card Technical Report synthesizes the results of that survey and provides some case study examples of improvements made by upgrades to signal timing and the benefits received by the travelers in their service areas. It also details estimated costs to upgrade and retime the national traffic signal infrastructure over 10 years.

Assuming the U.S. has 270,000 signals, the annual costs associated with signal timing can be calculated. These costs reflect updated prices from the 2005 report.

Hardware:
Each year 1/10 of the controllers are replaced
270,000/10 = 27,000 controllers per year
Furnish and Installation costs are approximately $13,500 per signal
Total cost is $367.2 million per year

Timing updates:
Signal retiming interval is every three to five years
$3,000 per signal
Total cost is roughly $217.6 million per year

Maintenance:
One technician maintains 30 signals
270,000/30 = 9,000 technicians
$60,000 per technician
Total cost is roughly $540 million per year

Grand total cost for signal timing per year across the U.S. is $1.125 billion.


System Cost Comments

No comments posted to date

Comment on this System Cost

To comment on this summary, fill in the information below and click on submit. An asterisk (*) indicates a required field. Your name and email address, if provided, will not be posted, but are to contact you, if needed to clarify your comments.



Source

National Traffic Signal Report Card: Technical Report 2007

Author: Institute of Transportation Engineers (ITE)

Published By: National Transportation Operations Coalition (NTOC)

Source Date: December 31, 2007

URL: http://www.ite.org/reportcard/

System Cost

Costs to update signal timing remains about $3,000 per intersection.
Cost to furnish and install a new signal is about $13,500.
Total annual costs for an update to the national signal system would cost $1.125 billion annually.

Rating

Average User Rating

0 ( ratings)

Rate this System Cost

(click stars to rate)


Related Unit Cost Subsystems

Roadside Control (RS-C)

Keywords

coordinated signals, signal coordination, centralized signal control, signal synchronization, traffic signals, advanced signal control, signal timing optimization, coordinated signal control, advanced signal controller, traffic signal retiming, retiming, adaptive signals

Cost ID: 2011-00222