Cost Subsystem
Description

LOAD CENTER CABINET (TYPE IV) (WITH TRANSFORMER AND METER)

Capital Cost Per Unit
$14,000.00
Adjusted Capital Cost Per Unit
$12,324.20
Reported Units
12
Unit Cost Type
Unit
Each (EA)
CPI ID
2
CPI Name

WPU1178

Year
2009
Notes
Arizona Bid Tab 2009096 - AZDOT Estimate