Cost Subsystem
Equipment
Machine Vision Sensor at Intersection
UNID
D3DA689A1722AFA085256F1F00618EB9
Lifetime
10
Sort Number
0
Unadjusted Low Capital Cost
5.22
Unadjusted High Capital Cost
25.50
Unadjusted Capital Cost Date
Unadjusted High O&M Cost
1.00
Unadjusted Low O&M Cost
0.20
Unadjusted O&M Cost Date
Adjusted Low Capital Cost
4.89
Adjusted High Capital Cost
18.96
Adjusted Capital Cost Date
Adjusted Low O&M Cost
0.15
Adjusted High O&M Cost
0.74
Adjusted O&M Cost Date
Sort
18.10
Unadjusted Notes

Four-way intersection, one camera per approach. Does not include installation.

Adjusted Notes

Four-way intersection, one camera per approach. Does not include installation.

Sample Unit Cost