METHODOLOGYBefore and after data were collected to evaluate performance. Data collected prior to installation represented corridor performance using coordinated signal control operations with timing…
METHODOLOGYA benefit cost analysis was completed to determine how long each system would take to pay for itself. Before and after data were collected to evaluate performance and the following factors…
This report summarized results of an evaluation of two different commercial real-time adaptive signal control systems installed on two different corridors in Colorado. The InSync system was installed…