Sample unit cost consist of cost entries for ITS components that have been compiled from available sources, typically bid tabulation data from state DOTs. Costs are presented in the original year of expenditure and in inflation or index-adjusted dollars. For more information on Sample Unit Costs, see the Costs FAQ page.

Search entire item's text

Displaying 1 - 10 of 16

Identifier Cost Subsystem Unit Cost Element Unit Cost Component Description Capital Cost Per Unit OM Cost Per Unit Adjusted Capital Cost Per Unit Adjusted O&M Cost Per Unit Reported Units Lifetime Location Unit Cost Type Unit CPI ID CPI Name Year Source Associated System Cost
UC2010-00238 Roadside Telecommunications (RS-TC) Conduit Design and Installation - Corridor Conduit Design and Installation - Corridor

PVC Conduit

$64,000.00 $74,163.20 30 Portland, Oregon, United States Actual Per Mile 1 WPU1176 ITS Integration Program Unit Cost Data…
UC2010-00762 Transit Management Center (TR) Transit Real Time Information System Servers & Software

Transit Real Time Information System Servers & Software

$125,000.00 $142,075.00 5 Portland, Oregon, United States Actual System 3 PCU511210511210502 Real-time Bus Arrival Information Systems…
UC2010-00240 Remote Location (RM) Transit Status Information Sign Transit Status Information Sign

Single line 120x7 readerboard (Adaptive Micro Systems P/N 1014-2001B),…

$16,800.00 $2,500.00 $12,240.48 $1,821.50 30 Portland, Oregon, United States Actual Each (EA) 2 WPU1178 ITS Integration Program Unit Cost Data…
UC2010-00235 Roadside Detection (RS-D) Transponder Reader

Hardware and installation for transponder reader for trucks.

$9,000.00 $7,722.90 Oregon, United States Unknown Each (EA) 2 WPU1178 Developing Corridor-Level Truck Travel…
UC2010-00239 Roadside Information (RS-I) Dynamic Message Sign Variable Message Sign

This is a small dynamic message sign (DMS) installed along arterial.…

$16,400.00 $250.00 $11,949.04 $182.15 15 Portland, Oregon, United States Actual Each (EA) 2 WPU1178 ITS Integration Program Unit Cost Data…
UC2010-00668 Transit Vehicle On-Board (TV) Mobile Data Terminal - Fixed Route Service

Mobile Data Terminal - Fixed Route Service Tri-County Metropolitan…

$4,200.00 $111.00 $3,301.62 $87.26 900 Portland, Oregon, United States Per Vehicle 2 WPU1178 TCRP Synthesis 70: Mobile Data Terminals…
UC2010-00669 Transit Vehicle On-Board (TV) Mobile Data Terminal - Fixed Route Service Installation

Mobile Data Terminal - Fixed Route Service Tri-County Metropolitan…

$500.00 $393.05 900 Portland, Oregon, United States Per Vehicle 2 WPU1178 TCRP Synthesis 70: Mobile Data Terminals…
UC2010-00672 Transit Vehicle On-Board (TV) Mobile Data Terminal - Fixed Route Service Installation

Mobile Data Terminal - Fixed Route Service Tri-County Metropolitan…

$1,000.00 $786.10 900 Portland, Oregon, United States Per Vehicle 2 WPU1178 TCRP Synthesis 70: Mobile Data Terminals…
UC2022-07208 Roadside Information (RS-I) Sequential Arrow Signs

Sequential Arrow Signs

$4,220.00 $4,097.62 1 Oregon, United States Bid Tabulation Each (EA) 2 WPU1178
UC2022-07209 Roadside Information (RS-I) Sequential Arrow Signs

Sequential Arrow Signs

$6,422.00 $6,235.76 1 Oregon, United States Bid Tabulation Each (EA) 2 WPU1178