Location Name
Albersloher Weg
City
Country
Geo Type
Latitude
51.94
Longitude
7.65

Content that references this location

A German adaptive signal control system (MOTION) improved transit schedule adherence and reduced overall traffic delay by 40 percent.

METHODOLOGYThe evaluation was conducted in three stages.Stage-0 included collection of "Before" traffic performance data on the corridor where intersection control was partly pre-timed and partly…
Content type
Date Posted
10/01/2014