FINDINGS
Kansas DOT (KDoT) indicated the system design kept traffic moving safely, both through the construction site and along alternate routes. Large diversion rates (50 to 70 percent) were…
A benefit-to-cost estimated for the MAASTO TPIMS estimated as part of the 2015 TIGER Grant application using the TIGER BCA Resource Guide was based on project performance data collected from the…